Sort by:

126346 tenders

291b UAH awarded

Area

All
Road-repair works
160.6b UAH
Pipes
1.1b UAH
Asphalt
479.1m UAH
Bitumen
442.1m UAH
Paving and asphalting works
306.7m UAH
Paving slabs
296.3m UAH
Roadworks
268.3m UAH
Repair and maintenance services of firefighting equipment
182.6m UAH
Fittings
165.2m UAH
Resurfacing works
156.8m UAH
Surface work for footpaths
117.8m UAH
Heating pipes
106.7m UAH
Signs and related items
74.2m UAH
Road-surface painting work
66.9m UAH
Slip road construction work
50m UAH
Coated road materials
48.3m UAH
Folding steps
46.9m UAH
Containers for waste material
39.9m UAH
Carriageway resurfacing works
37.5m UAH
Footpath construction work
36.8m UAH
Surface boxes
34m UAH
Embankment works
33.9m UAH
Refuse skips
31.4m UAH
Surfacing work except for roads
29.8m UAH
Paths and other metalled surfaces
23.4m UAH
Installation works of walkways
22m UAH
Secondary road construction work
21.7m UAH
Sewer pipes
16.7m UAH
Installation of metal structures
12m UAH
Prefabricated constructions
11.7m UAH
Road-maintenance works
11.7m UAH
Water chambers
10.8m UAH
Bitumen and asphalt
10.6m UAH
Boundary boxes
10.3m UAH
Pipe connectors
6.7m UAH
Installation of road signs
6.5m UAH
Coating materials
5.8m UAH
Reinforced-concrete structures
5.3m UAH
Wire-rope accessories for handling goods
4.8m UAH
Bus-stop shelter construction work
4m UAH
Surface work for streets
3.9m UAH
Pipe joints
3.4m UAH
Car park building construction work
3.3m UAH
Drain covers
3.3m UAH
Nameplates
3m UAH
Pedestrian zone construction work
2.5m UAH
Cycle path construction work
1.7m UAH
Environmental Impact Assessment (EIA) services for construction
1.6m UAH
Address plates
1.5m UAH
Manhole covers
1.5m UAH
Prefabricated components
1.4m UAH
Verge maintenance work
1.3m UAH
Traffic-calming works
1.3m UAH
Installation of street furniture
1m UAH
Surface coating construction work
1m UAH
Erection of road-barriers
1m UAH
Bus garage construction work
1m UAH
Drain pipes
1m UAH
Pedestrian ways construction work
837.1k UAH
Pedestrian overpass construction work
753.2k UAH
Parking-lot-surface painting work
729k UAH
Winter-maintenance materials
470.9k UAH
Sacrificial anodes
460.6k UAH
Installation of road signals
367.3k UAH
Access covers
366.8k UAH
Prefabricated units and components
343.7k UAH
Insulated joints
310.9k UAH
Access road construction work
290.7k UAH
Drainage system
226.6k UAH
Installation of bollards
197.1k UAH
Risk or hazard assessment for construction
103.5k UAH
Shapes
76.7k UAH
Coated roadstone
53.1k UAH
Highway maintenance work
49.9k UAH
Crossroad construction work
49.5k UAH
Manhole step irons
45.4k UAH
Manhole frames
6.4k UAH
Installation of safety equipment
550 UAH
Prefabricated units
0 UAH

Risk Indicators

Purchasers

Suppliers

Category